Energy Projects

Delta Valve Project

Nitrogen Distribution System

Chev Central

PMI-Positive Material Identification

Over 15,000 Inspection ISO’s Generated In Our Tenure

Exclusive CAD Drafting Of P&ID’s With Over 3000 Generated In Our Tenure

P&ID Development and Verification

“C-201 BOTTOMS PIPING REPLACEMENT PHASE II”

Design or redesign of existing piping system, Tie-in List, Material Take-off List, Process P&ID, Piping Isometrics

Blending & Shipping Division Projects

T-190 Piping & Structural Modifications

Piping Design and technical support for piping from T-190 Tank

24” West Hill Line: Replacement 24” line, 1200 feet.

Pentane to Blender: New 4” turbine meter manifold. Cad piping plan with elevation, details and BOM.

6” Pentane Line: New 6” line, 3000 feet.

Tank 9408 Suction: piping plan and associated spool drawings.

Tank 1012 Water Draw Line Repair: including Cad Isometric with BOM..

Tank 934 Fill Spool: New spool drawing for 24” x 12” pipe replacement.

VGO to LABS Manifold – 10” at V-15:

VGO to LABS (488 JCT to 10 JCT): New 6” line, 900 feet

VGO to LABS tie-in at V-15: New 10” Line tie-in, 60 feet.

V-15 Diesel Blender to JCT 18 Supply Line: New 3” line, 330 feet.

Trans mix/Diesel at TK-283: 4” Line Segment to connect up two lines

12” Tank 194 Suction to LAX Pad: New 12” line, 1500 feet.

10” Off Test Meter Line: Replacement of existing 8” meter piping with new 10” turbine meter and 10” piping.

P.I.P.E Site Upgrade

Site Upgrade Data Base Development